3003 brazed aluminum water cooling plate material
Our advantage of 3003 brazed aluminum water cooling plate material :
1. Since 2006, we have rich experience in this aluminum heat exchange industry in China;
2. Good reputation in aluminum alloy material areas;
3. We start our productions from aluminum ingot,so we can control the quality as well;
4. Design ability: We have design team can provide design solution or suggestion.
5. Price advantage.
6. Good experience and cooperation with big clients in the world;
7. With Certificate ISO9001-2008;
8. Sample order is acceptable
9. High performance cost ratio;
10.Fast delivery time and fast resolve problem attitude.
Terms and conditions:
1, Trade term: CIF / CFR / FOB/ EXW
2, Payment term: 30% before production+70% before shipment;
100% Irrevocable L/C at sight
Or we can further communicate with each other about this part.
3, Shipment: Normally it is about 15-35days.





Product Details
| Product Name | Aluminum Water Cooling Plate for Electrical Vehicles and Car |
| Grade | 3003/4343 |
| Surface | Mill finish |
| Executive Standards | ASTM B209, JIS H4000-2006, GB/T3190-2008, GB/T3880-2006, etc. |
| Length | as customers' requirement |
| Width | as customers' requirement |
| Thickness | 1-4mm or customized |
| Packing | Wooden box |
| Temper | H / O |
| Payment Terms | TT, L/C at sight |
| Application | 1) radiator, condenser, evaporater, electrical car, electrical vehicle,PV panel |
| 2) Aircraft fuel tanks, oil pipe, rivets, wire; | |
| 3) Cans cover, car body panels, steering plates, stiffeners, brackets and other components; | |
| Shipment | By sea/by train/by air plane |
| Port | Shanghai port |
Our advantage of 3003 brazed aluminum water cooling plate material :
1. Since 2006, we have rich experience in this aluminum heat exchange industry in China;
2. Good reputation in aluminum alloy material areas;
3. We start our productions from aluminum ingot,so we can control the quality as well;
4. Design ability: We have design team can provide design solution or suggestion.
5. Price advantage.
6. Good experience and cooperation with big clients in the world;
7. With Certificate ISO9001-2008;
8. Sample order is acceptable
9. High performance cost ratio;
10.Fast delivery time and fast resolve problem attitude.
Terms and conditions:
1, Trade term: CIF / CFR / FOB/ EXW
2, Payment term: 30% before production+70% before shipment;
100% Irrevocable L/C at sight
Or we can further communicate with each other about this part.
3, Shipment: Normally it is about 15-35days.




